Cb-22 mounting electronics – FSR CB-22 User Manual
Page 2

FSR
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
43192
LIT1321B
CB-22 MOUNTING ELECTRONICS
TOWARDS
BOX BLANK
END
FOR 1RU x 19" EIA RACK-SIZED ELECTRONICS, INSTALL
RACK MOUNT BRACKETS AS SHOWN. INSTALL RACK
UNIT AND RE-INSTALL SHELF INTO CB-22. MAKE
ELECTRICAL CONNECTIONS AS REQUIRED.
NOTE: MAXIMUM LOAD PER SHELF - 20 LBS EACH
4b.
(2) SHELF
LOOSEN SHELF
SCREWS. (a) PUSH
SHELF TOWARDS
DOOR AND (b)
SHELF WILL DROP
DOWN OUT OF
CB-22
a
b
LOOSEN SCREWS (4 PER SHELF)
TO REMOVE SHELVES
4a. REMOVE SHELF, AND MOUNT ELECTRONICS TO SHELF.
USE HOLE/SLOT PATTERN ON SHELF TO MOUNT
EQUIPMENT. ADDITIONAL HOLES MAY BE REQUIRED.
SEE 4b. FOR INSTALLING RACK MOUNTED UNITS.
RE-INSTALL SHELF INTO CB-22. MAKE ELECTRICAL
CONNECTIONS AS REQUIRED.
NOTE: MAXIMUM LOAD PER SHELF - 20 LBS EACH
HOLES FOR ALTERNATE
LOCATION OF SHELVES
RIGHT RACK
MOUNT
BRACKET
SHELF
LEFT RACK
MOUNT
BRACKET
(4) #10-32 x 3/8"-LONG
PAN HEAD SCREW
ALTERNATE MOUNTING
HOLES FOR RACK
MOUNT BRACKETS