Fsr inc – FSR CB-12P User Manual
Page 2
![background image](https://www.manualsdir.com/files/786338/content/doc002.png)
FSR Inc.
244 Bergen Boulevard, Woodland Park, NJ 07424
Phone: 973.785.4347 - Fax: 973.785.4207
Web: www.fsrinc.com - E-mail: [email protected]
10-3/4" x 15-1/4"
DROP CEILING
PANEL MATERIAL
(SUPPLIED BY
CUSTOMER)
3. INSTALL 10-3/4" x 15-1/4" DROP CEILING PANEL MATERIAL
INTO DOOR OF CB-12P. BEND CAPTURE TABS OVER
PANEL TO HOLD PANEL IN PLACE.
(4) CAPTURE TAB
LOOSEN SCREWS
TO OPEN CB-12P DOOR
DOOR IS
REMOVABLE.
(a) PUSH DOOR
UP TOWARDS
CEILING AND
(b) PUSH AWAY
FROM
PROJECTOR
PANEL MOUNT -
REVERSE
PROCEDURE
TO INSTALL
a
b
4. REMOVE SHELF AND MOUNT ELECTRONICS TO SHELF.
USE HOLE/SLOT PATTERN ON SHELF TO MOUNT
EQUIPMENT. ADDITIONAL HOLES MAY BE REQUIRED.
RE-INSTALL SHELF INTO CB-12P. MAKE ELECTRICAL
CONNECTIONS AS REQUIRED.
NOTE: MAXIMUM LOAD PER SHELF - 20 LBS EACH
LOOSEN SCREWS (4 PER SHELF)
TO REMOVE SHELVES
LOOSEN SHELF
SCREWS. (a) PUSH
SHELF TOWARDS
PROJECTOR
MOUNT AND (b) SHELF
WILL DROP DOWN OUT
OF CB-12P
(2) SHELF
b
a
5. INSTALL PROJECTOR MOUNT PIPE INTO CB-12P. SECURE
PIPE WITH SET SCREW. FINISH INSTALLATION PER
MANUFACTURER'S PROJECTOR MOUNT INSTRUCTIONS.
PROJECTOR MOUNT SET
SCREW ACCESS HOLE
PROJECTOR MOUNT PIPE
(SUPPLIED BY CUSTOMER)
NOTE: MAXIMUM PROJECTOR LOAD INCUDING MOUNTED ACCESSORIES - 50 LBS
DISCONNECT
SAFETY CABLE
TO COMPLETELY
REMOVE DOOR
NOTE: THE CENTER OF MASS
OF SUSPENDED EQUIP-
MENT MUST BE WITHIN
A 2.5" RADIUS OF THE
CENTER LINE OF THE
FLANGE MOUNT OF THE
CEILING BOX.