Decommissioning – Flowserve LRG 16-40 User Manual
Page 28
8
Decommissioning
Replacing conductivity electrode
. Switch off power supply for all control units of the CAN bus system.
. Undo cover screws
H and remove terminal cover I.
3. Unplug terminal strip
J.
4. Remove conductivity electrode.
5. Install and connect new conductivity electrode.
6. Apply supply voltage to all control units.
Danger
Risk of severe burns and scalds to the whole body!
Before removing the electrode make sure that the vessel and the measuring pot are
depressurised (O bar) and cooled down to room temperature (0 °C).
Attention
The CAN-bus data line must not be interrupted during operation. Before removing bus
cables from the terminal strip make sure that all connected devices are out of service.
If data lines of equipment sending data are interrupted a malfunction message will be
generated.
Disposal
Remove the conductivity electrode and separate the waste materials in accordance with the material
specification.
Electronic components (boards) must be disposed of separately.
For the disposal of the conductivity electrode observe the pertinent legal regulations concerning waste
disposal.