beautypg.com

Wiring, Basic settings – Flowserve LRG 16-40 User Manual

Page 22

background image

Wiring

– continued –

Wiring diagram of conductivity electrode LRG 16-40, LRG 17-40

– continued –

Attention

n

Wire equipment in series. Star-type wiring is not permitted!

n

Link screens of bus cables such that electrical continuity is ensured and connect them

once to the central earthing point (CEP).

n

In the CAN bus network the first and the last equipment of the data line

must be

provided with a terminating resistor of 0 ohm (terminal C

L

/C

H

).

n

The CAN bus data line must not be interrupted during operation.

In the event of an interruption an alarm message will be generated.

Basic Settings

Factory settings

The conductivity electrode features the following factory set default values:

n

Baud rate: 50 kbit/s (5 m bus cable length)

n

Node ID: 05

Enter the assigned node ID on the name plate.

This manual is related to the following products: