Installation – Flowserve LRG 16-40 User Manual
Page 17
7
Installation
– continued –
. Put joint ring
M onto the electrode.
. Run all electrode wires through the hole for the fixing screw (see
Fig. 6) in the terminal box.
3. Place the terminal box onto the electrode part and turn it into the desired direction (cable gland).
Make sure that the joint ring is properly placed between the electrode and the terminal box.
4. Pull all electrode wires through the fixing nut
N. Use an open-end spanner A. F. 9 to fasten the
hexagon nut to the fixing screw, applying a torque of 5 Nm.
5. Connect the electrode wires according to the wiring diagram (see page ) to the terminal lugs
(electronic circuit board
O, functional earth L).
Mounting terminal box
Closing terminal box
When the work is finished:
. Install the terminal cover
I and tighten the cover screws H, ensuring correct position of the joint
ring.
Tools
n
Open-end spanner A. F. 9 mm
n
Open-end spanner A. F. 4 mm
n
Screwdriver for cross recess head screws, size and