beautypg.com

Installation – Flowserve LRG 16-40 User Manual

Page 17

background image

7

Installation

– continued –

. Put joint ring

M onto the electrode.

. Run all electrode wires through the hole for the fixing screw (see

Fig. 6) in the terminal box.

3. Place the terminal box onto the electrode part and turn it into the desired direction (cable gland).

Make sure that the joint ring is properly placed between the electrode and the terminal box.

4. Pull all electrode wires through the fixing nut

N. Use an open-end spanner A. F. 9 to fasten the

hexagon nut to the fixing screw, applying a torque of 5 Nm.

5. Connect the electrode wires according to the wiring diagram (see page ) to the terminal lugs

(electronic circuit board

O, functional earth L).

Mounting terminal box

Closing terminal box

When the work is finished:
. Install the terminal cover

I and tighten the cover screws H, ensuring correct position of the joint

ring.

Tools

n

Open-end spanner A. F. 9 mm

n

Open-end spanner A. F. 4 mm

n

Screwdriver for cross recess head screws, size and

This manual is related to the following products: