Revision history – Basler Electric BE1-50/51B-219 User Manual
Page 49

9252000981 Rev J
43
Revision History
Table 5 provides a historical summary of the changes made to this instruction manual. Revisions are
listed in chronological order.
Table 5. Instruction Manual Revision History
Manual
Revision and Date
Change
A, May-98
•
Added Patent number to Specifications. Changed manual format
to reflect the current style and added Section 7
B, Dec-99
•
Corrected Figures 3-1, 4-2, 4-3, 5-1, and 5-2. Changed all
references to the current for testing the targets to an ac only type
of current
C, Oct-00
•
Added BE1-50/51B-226, one ampere sensing input data
throughout the manual, and corrected switch values in Table 2-1
D, Dec-00
•
Updated drawings in Section 2 to reflect changes to the PC board.
Updated drawings to reflect changes to the overlay. Also updated
the rest of the manual to reflect the change in switch call out from
SW8 to SW3. Added new functionality to the PICKUP LED. It is
now the ACTIVE/PICKUP LED and will be green when active and
red when picked up
E, Sep-06
•
Changed factory setting of SW3-3 to OFF. Added note about hard
wiring relay to earth ground in Section 4, Installation
F, Jan-07
•
Moved Time Characteristic Curve Figures to Appendix A
•
Moved Section 6, Maintenance information into Section 4,
Installation
G, Mar-08
•
Updated front panel drawings
H, Jan-09
•
Removed notes about hard-wiring relay case to ground since relay
is a direct replacement, i.e. not shipped with a case
•
Updated Storage statement in Section 4
•
Modified Figure 5-2, Target Operational Test Setup
•
In Section 5, modified Target Test so that TIME and INST targets
can be verified independently from each other
•
Minor text edits throughout manual
J, Oct-14
•
Updated the year of IEEE standards used for type tests
•
Improved description of Locator H (Active/Pickup LED) in Table 2
•
Minor text edits throughout manual
BE1-50/51B-219/-226
Revision History