beautypg.com

Sc2400 setup and installation, Ground cable connections – Tru-Weld SC2400 Arc Welder User Manual

Page 13

background image

13 

 

SC2400 Setup and Installation 

Ground Cable Connections 

The SC2400 is equipped with two ground cable connections located in the front of the welder 
(lift access panel).  

Tighten ground cable to welder and secure other end to work surface using the Heavy‐Duty C‐
Clamp (see Figure 2).  

 

 

 

 

Access Panel 

Ground connections 

Figure 1 ‐ Front of SC2400 

Ground Cable Lug  (to welder) 

Ground Cable C‐Clamp  (to work surface) 

Figure 2  ‐ Ground Cable