Sc2400 setup and installation, Ground cable connections – Tru-Weld SC2400 Arc Welder User Manual
Page 13
13
SC2400 Setup and Installation
Ground Cable Connections
♦
The SC2400 is equipped with two ground cable connections located in the front of the welder
(lift access panel).
♦
Tighten ground cable to welder and secure other end to work surface using the Heavy‐Duty C‐
Clamp (see Figure 2).
Access Panel
Ground connections
Figure 1 ‐ Front of SC2400
Ground Cable Lug (to welder)
Ground Cable C‐Clamp (to work surface)
Figure 2 ‐ Ground Cable
This manual is related to the following products: