beautypg.com

Sc2400 setup and installation, Power connection diagrams – Tru-Weld SC2400 Arc Welder User Manual

Page 10

background image

10 

 

SC2400 Setup and Installation 

Power Connection Diagrams 

Electrical Input Requirement 

The SC2400 is equipped with an Input Voltage Jumper Block so you can operate the unit from dif‐
ferent line voltages depending on your requirements. These setting should be checked to see if 
they are properly positioned for the voltage being used.  

Cross the terminals on the Jumper Block with the jumper (Figure 1) and tighten down the hold 
down nuts. 

Use the schematic below for the jumper setting to suit your line voltage requirement 

L1 

L2 

L3 

575VAC  

L1 

L2 

L3 

460VAC  

Jumpers 

Figure 1 ‐ Jumper Block 

L1 

L2 

L3 

230VAC