Set-up instructions, Hydraulic system hook-up operating procedures – Pengo DT-5 User Manual
Page 20

20
Two Speed (DT & RT) Series Manual
SET-UP INSTRUCTIONS
3. Ensure that the hydraulic hose couplers are compatible 
with the hydraulic quick couplers on the Drive Unit.
If a hydraulic leak develops, correct it 
immediately. Escaping hydraulic fl uid can 
have extremely high pressure. A stream 
of high pressure fl uid may penetrate the 
skin. It is imperative that the connections are tight and that 
all hoses are in good working condition.
4. Once all of the hydraulic connections have been made and 
checked for leaks, the Drive Unit is ready for operation.
Hydraulic hoses and fi ttings used on the 
prime mover and Drive Unit must have a 
continuous operating pressure rating of 
at least 25% higher than the maximum 
pressure of the hydraulic system being used. Refer to 
the Drive Unit specifi cation chart for allowable maximum 
pressure. 
WARNING
CAUTION
R E A D A N D U N D E R S TA N D A L L S A F E T Y 
INFORMATION PRIOR TO MOUNTING YOUR DRIVE 
UNIT TO THE PRIME MOVER. SEE PAGES 7 & 13.
MOUNTING AND INSTALLATION
There are several ways to mount your Drive Unit 
depending on the prime mover and application.
A) Skid Steer Mounting (Quick Attach)
1. Remove the skid steer bucket or any other attachment 
from the skid steer quick attach mechanism.
2. Attach the quick attach mounting bracket the to the 
skid steer 
B) Backhoe and Excavator Mounting
1. Remove the bucket from the dipper arm and curl 
cylinder pin connections.
AUGER / ANCHOR CONNECTION
1. Align the auger bit or anchor with the output shaft 
of the Drive Unit. 
2. Slide the connecting coupler (hub) over the output 
shaft and align the coupler hole with the output shaft 
hole.
3. Connect the auger bit or anchor to the Drive Unit 
output shaft and secure it with appropriate connecting 
hardware.
When selecting connecting hardware 
ensure that the bolt or pin does not 
protrude from the coupler (hub) any 
more then necessary to secure. 
Hardware that protrudes an excessive amount can be 
a safety hazard and cause entanglement.
WARNING
HYDRAULIC SYSTEM HOOK-UP
OPERATING PROCEDURES
Your Pengo Planetary Drive Unit receives its hydraulic 
oil fl ow and pressure from the prime mover through the 
auxiliary hydraulic circuit via two quick release couplers 
near the end of the truck boom or excavator arm. Follow 
the steps below to complete the hydraulic hook-up 
between your prime mover and Drive Unit.
HYDRAULIC SYSTEM HOOK-UP
1. Locate the auxiliary hydraulic connection ports on the 
prime mover.
2. Determine the length of hydraulic hose necessary to 
connect the auxiliary hydraulic circuit to the Drive Unit. 
Be sure to allow suffi cient “slack” in the hose length to 
allow the Drive Unit to perform it’s full range of operation.
Before operating, always ensure that the Drive Unit and 
auger or anchor are connected correctly to the prime 
mover.
DRILLING / ANCHORING OPERATION
1. To begin drilling/installation, position the auger or anchor 
on the ground in the desired location. Engage the parent 
machines auxiliary hydraulics to rotate the auger or anchor 
in a clockwise direction.
2. Lower the parent machines arm(s) to engage the 
auger or anchor into the ground. Use only enough down 
pressure to assure positive penetration. Ease up on the 
down pressure if the auger or anchor rotation slows down 
drastically or stalls. Excessive down pressure will cause 
the Drive Unit to stall frequently.
Note: Do not continually stall the Drive Unit! Continued 
stalling may cause excessive heating of the hydraulic 
system and possible damage to the Drive Unit.
3. As the auger or anchor digs in the ground, the prime 
movers arm(s) or boom may travel through an arc. This 
means the operator may need to continually reposition 
the auger or anchor to ensure vertical application of the 
auger or anchor.
Continues on page 15.
