Prime mover operating positions – Pengo DT-5 User Manual
Page 16

16
Two Speed (DT & RT) Series Manual
PRIME MOVER OPERATING POSITIONS
C) Recommended:
Transport Position
Cradle the Drive against the mounting frame during
transport on the job site.
These illustrations represent the recommended working, transport and resting positions for your Pengo Drive attachment
when used with a skid loader prime mover.
A) Recommended:
Starting Position
Position the Drive and Auger vertically in desired
location and begin drilling.
B) Recommended:
Drill
Lower the prime mover arms in a
consistent vertical manner.
D) Recommended:
Resting / Parked
Park the prime mover with the Auger on the
ground.
E) Avoid:
Drilling Position
Avoid any drilling position that is not vertical. Auger
will be unstable and not easily controlled.
F) Avoid:
Drilling Position
Avoid any drilling position that is not vertical. Auger
will be unstable and not easily controlled.
G) Avoid:
Transport Position
Avoid transporting the Auger in a suspended free
swinging position. Damage can occur.
H) Avoid:
Resting / Parked Position
Avoid parking the prime mover with Drive and
Auger in a suspended position.
See page 17 for proper
sequence.
Drive torque capacity limited to 12,000 ft/lbs Max when
used on skid loader.