Prime mover operating positions – Pengo DT-5 User Manual
Page 19

Two Speed (DT & RT) Series Manual
19
PRIME MOVER OPERATING POSITIONS
These illustrations represent the recommended sequence for positioning the Drive attachment in a resting and or transport
position. It is important that the recommendations are followed to prevent damage to the attachment and ensure safety.
Starting Position
Position the Drive and Auger vertically in desired location.
Allow for ample room to maneuver the prime mover.
Transition Position
In order to safely position the attachment in a resting
position the following steps will need to be completed
simultaneously.
1. Lower the prime mover boom.
2. Allow the Drive and Auger to rotate towards the ground.
3. Maneuver the prime mover in reverse.
During this process the point of the Auger should not
lose contact with the ground. Failure to follow this
sequence can result in damage. Do not put the Auger
in a binding situation, this will cause damage to the
Drive output shaft!
Resting Position
When the Drive and Auger are in full contact with the
ground the attachment is now in its resting position.
2
1
1
3
IMPORTANT
Damage to the Drive output shaft can occur if
operating instructions are not followed.