Sheet11, Drawing view87, Drawing view109 – Future Automation MLS User Manual
Page 15: Drawing view111, Drawing view112, Detail view i (2 : 2.5), Future automation mls, Electrical connections

It is VERY important that when all of the
electrical connections are made, the
connector blocks are connected in the
way shown above, with all the wires
coming directly out the top of the
connector blocks.
I
Remove this screw to release the lid
Connect the IEC Power Lead Here
Connect the Infrared Sensor here
DETAIL I
SCALE 2 : 2.5
Electrical Connections
The MLS mechanism must be connected to the AC1, DC1 and DC2
blocks of connections.
Sheet 14 of 18
ISSUE: 011
www.futureautomation.co.uk
FUTUREAUTOMATION
MLS
Marine Lift Swivel Mechanism
Instruction Sheet