CLW QUAD SERIES CHILLER INSTALLATION MANUAL

Field Wiring and Control Setup

Line Voltage

High Voltage Connections

Connect power wiring as shown in the line voltage wiring

schematic on page 13.

Low Voltage Operation

Thermostat/Controller (Aquastat)

A two-stage 24 VAC thermostat or liquid controller (field

supplied) must be used to turn the

commercial chiller on

or off, and to switch it from cooling to heating if

necessary. Multiple chillers in the same bank must be

controlled from one thermostat/controller (must be

isolation relays for multiple unit applications).

Low Voltage Connections

Connect low voltage thermostat wiring as shown in the low

voltage wiring schematic on page 12. Connections shown

are for typical thermostat. Actual connections may vary

with specific device used.

NOTE: If a separate transformer is used to supply a Y1, Y2, or

B signal to the unit controls, isolation relays must be used.

CAUTION: Use only copper conductors for field

installed wiring. Terminals in the unit are not

designed for other types of conductors.

WARNING: All wiring must comply with local and

state codes. Disconnect the power supply before

beginning to wire to prevent electrical shock or

equipment damage.