E-z seal® sealing solution maintenance, Filing the flap moistener bottle, Filling the tape moistener bottle – Pitney Bowes DM1000 User Manual
Page 136: E-z seal® sealing solution maintenance -4, E-z seal, Sealing solution maintenance
9 • Maintaining and Updating
9 - 4
SV60951 Rev. B
E-Z Seal
®
Sealing
Solution
Maintenance
Your mailing system displays a message telling you when your E-Z Seal®
Solution is running low. When you receive this message, your system can
still seal approximately 50 envelopes.
Filing the Flap
Moistener Bottle
1. Open the main cover and
lift out the flap moistener
bottle.The bottle is located
to the left of the tape roll.
2. Remove the cap from the
bottle.
3. Add enough E-Z Seal® to
bring the level up to the
bottom of the fill cap.
4. Replace and tighten the
cap and return the bottle to
its original position.
5. Close the main cover.
Filling the Tape
Moistener Bottle
1. Open the main cover and
lift out the tape moistener
bottle.The bottle is located
near the tape exit.
2. Remove the cap from the
bottle.
3. Add enough E-Z Seal® to
bring the level up to the
bottom of the fill cap.
4. Replace and tighten the
cap and return the bottle to
its original position.
5. Close the main cover.
CAUTION:
•
Pitney Bowes recommends using E-Z Seal® Solution
because it helps keep your moistener tank clean and
improves sealing efficiency. To order E-Z Seal® Solution,
refer to Chapter 11, Supplies and Options in this guide.
•
Do not overfill the E-Z Seal® bottle.
•
Make sure you do not spill any solution in the tape well. If
the tape gets wet, it can warp and cause a jam.
Flap Moistener Bottle
Tape Moistener Bottle