beautypg.com

Figure 3-6, Drain flow diagram, Operation – Parr Instrument 6400 User Manual

Page 29

background image

Operation

6400

3

w w w . p a r r i n s t . c o m

27

Drain

At the completion of the bomb rinse sequence, the drain sequence begins.

Figure 3-6

Drain Flow Diagram

The water in the bucket is drained out of the bucket and routed to the drain connection. Once the bucket is
drained, the calorimeter may be opened to remove the bomb head and load the next sample.