Figure 3-6, Drain flow diagram, Operation – Parr Instrument 6400 User Manual
Page 29

Operation
6400
3
w w w . p a r r i n s t . c o m
27
Drain
At the completion of the bomb rinse sequence, the drain sequence begins.
Figure 3-6
Drain Flow Diagram
The water in the bucket is drained out of the bucket and routed to the drain connection. Once the bucket is
drained, the calorimeter may be opened to remove the bomb head and load the next sample.
See also other documents in the category Parr Instrument Measuring instruments:
- 1341 (16 pages)
- 1108 (20 pages)
- 1901 (2 pages)
- 1104 (12 pages)
- 1121 (4 pages)
- 1755 (2 pages)
- 1552 (1 page)
- DP8340R Series (52 pages)
- Attaching Platinum Fuse Wire (1 page)
- 1281 (2 pages)
- 1271 (2 pages)
- Performa Therm Liquid Calorimetric Thermometers (2 pages)
- 1108P (20 pages)
- 1356 (41 pages)
- 6300 (130 pages)
- 6200 (94 pages)
- 6200 (88 pages)
- 6100 (82 pages)
- 6510 (16 pages)
- 1564 (12 pages)
- 6400 (103 pages)
- 6772 (70 pages)
- 6725 (76 pages)
- 6755 (52 pages)
- 6750 (36 pages)
- 1108V (4 pages)
- 1108R (20 pages)
- Safety Rupture Disc Assemblies (8 pages)
- Magnetic Drive (16 pages)
- 44HC5 Metal Gaskets (1 page)
- Flexible Graphite Gaskets (1 page)
- Pressure Relief Valves (2 pages)
- Series 5100 (32 pages)
- Series 4520 (32 pages)
- Series 4530 (28 pages)
- Series 4540 (32 pages)
- Series 4550 (28 pages)
- Series 4560 (28 pages)
- Series 4570 (28 pages)
- Series 4580 (28 pages)
- Series 4590 (28 pages)
- Series 5000 (20 pages)
- Series 4555 (48 pages)
- 4575/76 HP/HT (24 pages)