Bomb firing, Post-period, Operation – Parr Instrument 6400 User Manual
Page 27

Operation
6400
3
w w w . p a r r i n s t . c o m
25
Bomb Firing
Once the initial equilibrium is confirmed, the con-
troller initiates the firing sequence. There are no
changes to the circulation pattern, as shown in
Figure 3-4, from the pre-period through the bomb
firing and post-period. A warning of short beeps is
sounded indicating the bomb is about to be fired.
Post-Period
A minimal temperature rise will confirm that the
sample has ignited. After this verification, the post-
period begins. See Figure 3-4.
1. The controller monitors the temperature rise
and determines the final temperature rise by
either the dynamic or equilibrium criteria as
established by the user.
2. Once the final temperature rise is determined,
it is recorded with the test results.
- 1341 (16 pages)
- 1108 (20 pages)
- 1901 (2 pages)
- 1104 (12 pages)
- 1121 (4 pages)
- 1755 (2 pages)
- 1552 (1 page)
- DP8340R Series (52 pages)
- Attaching Platinum Fuse Wire (1 page)
- 1281 (2 pages)
- 1271 (2 pages)
- Performa Therm Liquid Calorimetric Thermometers (2 pages)
- 1108P (20 pages)
- 1356 (41 pages)
- 6300 (130 pages)
- 6200 (94 pages)
- 6200 (88 pages)
- 6100 (82 pages)
- 6510 (16 pages)
- 1564 (12 pages)
- 6400 (103 pages)
- 6772 (70 pages)
- 6725 (76 pages)
- 6755 (52 pages)
- 6750 (36 pages)
- 1108V (4 pages)
- 1108R (20 pages)
- Safety Rupture Disc Assemblies (8 pages)
- Magnetic Drive (16 pages)
- 44HC5 Metal Gaskets (1 page)
- Flexible Graphite Gaskets (1 page)
- Pressure Relief Valves (2 pages)
- Series 5100 (32 pages)
- Series 4520 (32 pages)
- Series 4530 (28 pages)
- Series 4540 (32 pages)
- Series 4550 (28 pages)
- Series 4560 (28 pages)
- Series 4570 (28 pages)
- Series 4580 (28 pages)
- Series 4590 (28 pages)
- Series 5000 (20 pages)
- Series 4555 (48 pages)
- 4575/76 HP/HT (24 pages)