beautypg.com

Purge, Pump tube installation – Hanna Instruments HI 84442 User Manual

Page 21

background image

21

PURGE

Purging should be performed:
• whenever the tube of the peristaltic pump is replaced;
• whenever the titrant is changed or a new bottle is used;
• before starting a pump calibration;
• before starting a lot of titrations.
In order to start purging press the Purge key from the titrator main screen. The purging stops

automatically after 5 minutes.
To access the Purge key follow the next steps:
• From the instrument main screen (pH meter screen) press “Titrator” function key.

The instrument will display the next screen if any of the following conditions exist:

- the meter hasn’t been calibrated in 4.01 pH buffer

- the pH calibration has expired
- a pump calibration hasn’t been performed or more than 3 days have passed since the last

pump calibration

PUMP TUBE INSTALLATION

To mount the new peristaltic pump tube follow next steps:
• Position one peristaltic pump fixing ring on its location.
• Stretch the tube over the peristaltic pump rolls.
• Fix the second pump fixing ring on its location.
• Attach the tube to the reagent bottle.
Note: Purge the peristaltic pump until drops of reagent

appears on the dosing tip by pressing the PURGE key from the titrator main screen.

To remove the tube of the peristaltic pump follow next steps:
Caution: Purge line with water to remove titrant solution from tube.
• Detach the tubes system from the reagent bottle.
• Grasp one fixing ring of the peristaltic pump tube.
• Pull the tube until the fixing rings are taken out from their location.
• Remove the other side of the tube.