beautypg.com

Installation – Glow-worm Ultracom2 sxi User Manual

Page 14

background image

0020092785_02 - 05/10 - Glow-worm

- 12 -

7.4

Mounting

• Make sure that the equipment used for implementing the

installation is compatible with that of the appliance.

• Determine the assembly location. See the "Appliance

location" chapter.

735

709

63***

160

160

=246=

170

Ш105**

Ш125*

123

123

*

80/125 flue ► Ø150mm

** 80/125 flue ► Ø130mm

*** 80/125 flue ► 156mm

• Take the wall template and place in the desired position

on the wall, giving due consideration to the required boiler

clearances, see chapter "Appliance location ► Clearances",

and the flue you are fitting.

7.4.1

Fixing to the wall

130

90°

4

5

6

2

1

3

Key

1 Wall template

2 Standard flue length horizontal

3 2.5° 44mm/metre inclined extended flue length

4 Wall plug

5 Hanging bracket

6 Screw (not supplied)

Flue hole cutting

• Mark the position of the flue centre.

• Remove the wall template, then drilling the flue hole.

i

The flue is designed with an internal fall of 44mm/

metre (2.5º), therefore the hole can be drilled

horizontally.

• Use a 105mm diameter core drill for external access flue

installation (60/100 flue) (80/125 flue ► Ø130mm).

• Use a 125mm diameter core drill for internal access only flue

installation (60/100 flue) (80/125 flue ► Ø150mm).

i

If flue extension pipes are to be used then a core

drill size of 125mm is required. This will allow the

extension pieces to slope at 44mm/metre (2.5º)

towards the boiler.

• If fitting a side flue, extend the flue centre line into the corner

then 130mm along the adjacent wall.

• If fitting an extended side flue, determine the flue hole centre

by extending the dashed inclined line on the template to the

side wall. This dashed line is drawn at 44mm/metre (2.5º)

rise from the boiler. Where this line reaches the side wall, a

horizontal line should be marked. The vertical centre line of

the flue should then be marked at 130mm from the back wall.

To allow for the flue passing through the wall at this angle

a 125mm hole should be drilled irrespective of internal or

external installation.

Hanging bracket fixing

Due to the varied site conditions, fixings are not supplied and

advise that the installer should supply those which are suitable.

• Drill the holes for the fixing screws in accordance with the

wall template.

• Fix the hanging bracket on the wall.

INSTALLATION