5.3 Water Circulation System
Complete the water connections to the boiler.
Fill, vent and flush system.
Check for any leaks and put right.
5.4 Safety Valve Discharge
Fit a suitable discharge pipe to the safety valve and route it
outside the building so that any discharge can be seen but will
not cause injury to person, damage to property or any electrical
installation.
5.5 Gas Connection
Make the gas connection to the Rc
1
/
2
in gas service cock, see
diagram 5.5.
Check for leaks using a suitable leak detection fluid.
The whole of the gas installation, including the meter, should be
inspected, tested for soundness and purged in accordance with
the current issue of BS6891 and in IE the current edition of I.S.
813 "Domestic Gas Installations".
Diagram 5.5
Diagram 5.3
CLEAR
RED
FLUE HOOD
SECURING
SCREW (4)
FAN SECURING
SCREWS
FAN
ASSEMBLY
AIR PRESSURE
SENSING PIPES
CLEAR
ELECTRICAL
CONNECTIONS
Diagram 5.4
FLUE HOOD
SECURING SCREWS (4)
FAN
SECURING
BRACKET
FLUE
HOOD
GAS SERVICE COCK
(SHOWN OFF)
UNION NUT
4287
4289
4288
5 Boiler Installation