5.0 Operation
5.0 Operation
5.0 Operation
5.0 Operation
5.1 Starting Up
5.1.1 Checking the Installation
Ascertain that all connections have been made and that the complete installation complies with current standards in
force.
W
ARNING
:
ENMET Corporation
is not responsible for the compliance of the complete electrical safety system.
The
MX52 C
ONTROL
power input should be protected with circuit breakers provided for that purpose, and that assure
protection of the power unit. The circuit breakers are to be selected according to the power consumption levels
specified by the manufacturer and the length of the electric cables. The circuit breakers can also be used to interrupt
power to the control
Figure 10: Operation Components
Optional
Buzzer switch
See detail 10a below
Programming switch
Item B
Calibration switch
Item C
Keypad area
Item D
On/Off switch
Item A
Display
Detail 10a: Optional Buzzer switch