Drill first pipe, Jt9 operator’s manual – Ditch Witch JT9 User Manual
Page 81
Conduct a Bore - 80
JT9 Operator’s Manual
Drill First Pipe
CMW
®
Drill First Pipe
1.
Turn on drilling fluid.
2.
Visually check for drilling fluid flow.
3.
Turn drill bit to starting position. See “Prepare Entry Point” on page 58.
4.
Slowly move carriage forward. See “Prepare Entry Point” on page 58. Take care to steer to drill
straight in line with drilling unit. Drill in downhole tools and 1/3 of first pipe before steering.
5.
Monitor gauges.
Turning shaft can kill you or crush arm or leg. Stay away.
To help avoid injury:
•
Keep everyone at least 10’ (3 m) away from turning drill string.
•
Push rod or pipe slowly. Forcing can bend string. Do not use bent rod or pipe.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment.
- JT5 (161 pages)
- JT922 (159 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)