Working under drilling unit, Opening/closing front hood, Jt9 operator’s manual – Ditch Witch JT9 User Manual
Page 128
JT9 Operator’s
Manual
Service - 127
Service Precautions
CMW
®
Working Under Drilling Unit
Before working under area of drilling unit
supported by a stabilizer, make sure drilling unit is
parked on hard surface.
1.
Remove yellow cylinder lock from storage at
rear of pipe box and place over extended
cylinder rod (shown) with curved ends toward
stabilizer shoe.
2.
Raise stabilizer to lower unit until load is
supported by cylinder lock.
Opening/Closing Front Hood
To open
1.
Unlock hood at outside latches (1).
2.
Press key lock buttons to release latches and
tip hood toward you.
3.
Release inside latch (2).
4.
Lift hood to remove.
To close
1. Align pins (3) with designated holes.
2.
Secure inside latch (2).
3.
Secure latches (1). Lock if necessary.
Crushing weight could cause death or serious injury. Use
proper procedures and equipment or stay away.
- JT5 (161 pages)
- JT922 (159 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)