50 hour, Drilling unit, Jt9 operator’s manual – Ditch Witch JT9 User Manual
Page 139
Service - 138
JT9 Operator’s
Manual
50 Hour
CMW
®
50 Hour
Drilling Unit
Check Rotation Gearbox Oil Level
Check rotation gearbox oil level every 50 hours. Fill
through plug (1) with MPL as needed.
Location
Task
Notes
DRILLING
UNIT
Check rotation gearbox oil level
MPL
Change fluid pump oil level (initial)
Initial service, NDO
Check oil cooler
Change hydraulic filter
Initial service
Check ground drive gearbox oil level
2 gearboxes, MPL
Inspect thrust rollers
Lubricate rotation gearbox sliding output shaft
EPS
Check and adjust belt tension
Tier 4i only
Clean alternator cooler turbine
Tier 4i only
Clean radiator
Tier 4 only
IMPORTANT: Drill frame must be level for
accurate reading.
See also other documents in the category Ditch Witch Special machinery:
- JT5 (161 pages)
- JT922 (159 pages)
- JT20 (195 pages)
- JT1220 (201 pages)
- JT2020 (203 pages)
- JT25 (203 pages)
- JT30 (245 pages)
- JT60 (218 pages)
- JT100 (243 pages)
- AT Air Hammer (11 pages)
- TK Series Manual (61 pages)
- 8500 (77 pages)
- MR90 (121 pages)
- FT5 (28 pages)
- FM5 (57 pages)
- FM13V (46 pages)
- FM25 (67 pages)
- P80 (71 pages)
- OnGrade (63 pages)
- FX20 (100 pages)
- FX25 (119 pages)
- FX30 (149 pages)
- FX50 (141 pages)
- FX60 (157 pages)
- MV800 (111 pages)
- RT Line (115 pages)
- RT30 (97 pages)
- RT45 (203 pages)
- RT55 (177 pages)
- RT100 (161 pages)
- RT115 (252 pages)
- RT120 (223 pages)
- Zahn (105 pages)
- RT80 (203 pages)
- RT115 Q (193 pages)
- RT120 Q (211 pages)
- 100SX (50 pages)
- 410SX (131 pages)
- SK350 (77 pages)
- SK750/SK755 (81 pages)
- SK850 (107 pages)
- SK850 Footings Machine (107 pages)
- 150RT (55 pages)
- 250RT (49 pages)