Planning, Setting up at jobsite, Drilling – Ditch Witch JT9 User Manual
Page 43: Jt9 operator’s manual
Operation Overview - 42
JT9 Operator’s Manual
Planning
CMW
®
Planning
1.
Gather information about jobsite. See page 47.
2.
3.
Classify jobsite. See page 50.
4.
5.
Check supplies and prepare equipment. See page 59.
6.
Setting Up at Jobsite
1.
2.
Unload drilling unit from trailer. See page 69.
3.
Position drilling unit and frame. See page 73.
4. Assemble strike system. See page 93.
5. Anchor drilling unit. See page 93.
6.
Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.
Drilling
1.
2.
Prime drilling fluid pump. See page 73.
3.
Engage tracker control if desired. See page 104.
4. Assemble drill string. See page 77.
5.
Drill first pipe. See page 80.
6.
Record bore path. See page 83.
8.
Drill remaining pipes in pipe box.
•
Correct direction. See page 82.
9.