Assemble drill string, Prepare beacon housing, Attach transition sub – Ditch Witch JT922 User Manual
Page 81: Jt922 operator’s manual

Conduct a Bore - 80
JT922 Operator’s Manual
Assemble Drill String
CMW
Assemble Drill String
Prepare Beacon Housing
1.
Select nozzles and bit.
2.
Insert nozzle into beacon housing.
3.
Attach bit (2) to beacon housing (1).
4.
Install beacon, following beacon instructions for:
•
battery replacement
•
beacon positioning
5.
Install beacon housing lid. See “Beacon Housings”
on page 110.
6.
Follow beacon instructions to check beacon operation.
7.
Follow tracker instructions to calibrate beacon.
Attach Transition Sub
Use either machine torque or quick wrench to attach transition sub (3) to beacon housing (1).
Machine Torque
1.
Pull transition sub into front wrench.
2.
Close wrench.
3.
Lube joints.
4.
Slowly make up joint.
5.
Use full machine torque to tighten joint fully.
Quick Wrench
1.
Lube joints with TJC.
2.
IMPORTANT: A variety of nozzles and bits
are available to suit your particular job
conditions. See “Downhole Tools” on
page 109 for more information, or contact
your Ditch Witch dealer.