Operation Overview - 46
JT922 Operator’s Manual
Planning
CMW
Planning
1.
Gather information about jobsite. See page 51.
2.
3.
Classify jobsite. See page 54.
4.
5.
Check supplies and prepare equipment. See page 63.
6.
Setting Up at Jobsite
1.
2.
Unload drilling unit from trailer. See page 73.
3.
Position drilling unit and frame. See page 77.
4.
Assemble strike system. See page 95.
5.
Anchor drilling unit. See page 93.
6.
Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.
Drilling
1.
2.
Prime drilling fluid pump. See page 77.
3.
Engage tracker control if desired. See page 106.
4.
Assemble drill string. See page 80.
5.
Drill first pipe. See page 82.
6.
Record bore path. See page 85.
7.
8.
Drill remaining pipes in pipe box.
•
Correct direction. See page 84.
9.