Commissioning check list, General, Ducted reverse cycle system – Bonaire Reverse Cycle User Manual
Page 34: Ductwork

Multi-Appliance Comfort Control
Page 34
Controls- Installation / Setup / Commissioning
COMMISSIONING CHECK LIST
G
ENERAL
All equipment ordered by the customer is installed.
The mains and control wiring are complete and the main switch and circuit breaker turned ON.
All Controller functions for the appliance operate.
All electrical, pipe and drain connections are to manufacturer’s specifications and the relevant local
and national codes.
Operate the air conditioner for heating and cooling.
D
UCTED
R
EVERSE
C
YCLE
S
YSTEM
Outdoor unit is installed away from flammable and corrosive materials and fumes (i.e. pool
chlorine/petrol etc).
The system has been leak checked and evacuated as per the installation instructions.
All installer settable functions have been adjusted and set correctly.
Indoor unit platform or suspension mounting is suitable as per the installation instructions.
Indoor unit is level.
Indoor unit drain/s have been checked and tested for flow and leaks.
Outdoor unit foundation / platform are suitable as per the installation instructions.
Outdoor unit is level.
All clearances around the outdoor unit are to the manufacturer’s specifications.
Check for abnormal noise or vibration during operation of both heating and cooling.
Check that the noise, condensate drainage or air flow does not disturb the neighbors.
D
UCTWORK
All ductwork is completed to plan, correctly supported and airtight.
Air distribution checked, dampers are adjusted and all outlets correctly adjusted and wiped clean.