beautypg.com

NordicTrack NTE11920 User Manual

Page 7

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

5, Identify the Left Pedal (10). Attach the Left Pedal to

the Left Pedal Leg (4) with two M8 x 58mm Button

Screws (83).

Attach the Right Pedal (11) to the Right Pedal Leg (5)

in the same way.

Attach two Pedal Wheels (28) and a Wheel Spacer

(31) to the Wheel Frame (30) with an M10 x 78mm Bolt
Set (65). Make sure that the Bolt Set, Pedal Wheels,

and Wheel Spacer are oriented as shown; the

bushing in the Wheel Spacer (see the inset drawing)
must be facing away from the Wheel Frame.

Attach the other two Pedal Wheels and the other
Wheel Spacer (not shown) to the Wheel Frame (not
shown) on the Right Pedal Leg (5) in the same way,

6, Have another person hold the Upright (2) in the posi­

tion shown. Make sure that the Upright is turned as
shown in drawing 7 below.

Connect the Upper Wire Harness (115) to the Lower

Wire Harness (42). Carefully pull the upper end of
the Upper Wire Harness to remove the slack from
the Wire Harnesses. Insert the Upright (2) into the

Frame (1). Be careful to avoid disconnecting or
pinching the Wire Harnesses. Attach the Upright with

two M10

X

110mm Button Screws (70), two M10 Split

Washers (73), and two Spacers (109); make sure that
the curved sides of the Spacers are facing the

Upright. Be careful to avoid damaging the Wire
Harnesses with the Button Screws.

7, Have another person hold the Left Handlebar (24) near

the Upright (2) as shown. Connect the left Pulse

Sensor Wire (20) to the Pulse Extension Wire (114).

Slide the upper end of the Left Handlebar (24) into the

tube on the front of the Upright (2), while sliding the

lower end of the Left Handlebar onto the tube on the
left side of the Upright. Attach the upper end of the Left
Handlebar with two M8 x41mm Button Bolts (85) and

two MS Jam Nuts (86); be careful not to damage the

Pulse Sensor Wire (20) or the Pulse Extension Wire
(114) as you insert the Button Bolts. Make sure

that the Jam Nuts are resting in the hexagonal

holes in the Left Handlebar. Attach the lower end of

the Left Handlebar with an M8 x 38mm Button Bolt

(105) and an M8 Jam Nut (86).

Attach the Right Handlebar (23) to the Upright (2) in
the same way.