beautypg.com

Tools required, Other materials needed, Engageivi nt handle – MTD 249-640A User Manual

Page 4: Engagement rod, I t t t

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

TOOLS REQUIRED:

(1) 1-1/8" wrench or adjustable wrench

(2) 1/2" wrenches

(1) 3/4" wrench

(2) 7/16" wrenches

(2) 9/16" wrenches

OTHER MATERIALS NEEDED:

(A) One gallon or regular grade gasoline (for engine)

(B) 2-3/4 pints of SAE 30 or 10W oil (for engine)

(C) 2-1/2 gallons of 10W 30 H.D. oil only (for

Splitter)

(D) Cleaning rag

(E) Funnel

(F) Hydraulic sealant tape (for pipe threads)

C-'

* F.

G-

H-

-r K—

L---

i T T T

i

figure

1

Your Log Splitter is shipped in two cartons.

1.

Remove the engine (with frame), two wheels

engagement rod, engagement handle, hoses and
hardware pack. See figures 1 & 2.

2. Remove the beam assembly from the other carton.

LIST OF CONTENTS IN HARDWARE PACK:

See figure 1.

A.

(2)

Sq. Head Set Screws

B.

(2)

Collars

C.

(2)

Spacers

D.

(1)

Hex Nut 3/8-24 Thread

E.

(1)

Pivot Bushing

F.

(1)

Hair Pin Cotter

G.

(4)

Hex Screws 5/16-24 x 1.00" long

H.

(4)

Lockwashers 5/16" Scr.

1.

(4)

Hex Nuts 5/16-24 Thread

J.

(1)

Shoulder Bolt

K.

(1)

Hex Nut 3/8-16 Thread

L.

(1)

Stud 3/8-16

X

2.75" Long

M.

(1)

Hose Clamp

N.

(1)

Shoulder Bolt

0.

(1)

Flat Washer

P.

(1)

Forward Stroke Stop Bracket

Q.

(1)

Hex Screw 1/4-20 x 1.25" Long

R.

(1)

Hex Nut 1/4-20 Thread

ENGAGEIVi NT
HANDLE

.ENGAGEMENT ROD

,V FORWARD

STROKE

HIGH
PRESSURE

HOSE

HIGH
PRESSURE
HOSE

FIGURE 2