Attach clutch cable (see fig. 6), Connect shift rod (see fig. 7), Remove tiller from crate – Poulan 184877 User Manual
Page 6: Checktire pressure, Handle height, Assembly
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
ASSEMBLY
ATTACH CLUTCH CABLE (See Fig. 6)
• Hook end of clutch cable through hole in control bar
bracket if necessary.
CONNECT SHIFT ROD (See Fig. 7)
•
Insert end of shift rod into hole of shift lever indicator.
•
Insert hairpin clip through hole of shift rod to secure.
REMOVE TILLER FROM CRATE
•
Make sure shift lever indicator is in “N” position (See
Fig. 7)
•
Tilt tiller forward by lifting handle. Separate cardboard
cover from leveling shield.
•
Rotate tiller handle to the right and puli tiller out of
carton.
CHECKTIRE PRESSURE
The tires on your unit were overinflated at the factory for
shipping purposes. Correct and equal tire pressure is
important for best titling performance.
•
Reduce tire pressure to 20 PSI (1.4 kg/cm^).
HANDLE HEIGHT
•
Handle height may be adjusted to better suit operator.
(See TO ADJUST HANDLE HEIGHT” in the Service
and Adjustments section of this manual).