beautypg.com

Carrier Puron 38EYA User Manual

Page 2

background image

INSTALLATION

IMPORTANT:

Specifications for this unit in residential new

construction market require using the outdoor unit, indoor unit,
refrigerant tubing sets, metering device, and filter drier listed in
presale literature. There can be no deviation. Consult the Appli-
cation Guideline and Service Manual for Residential Split-System
Air Conditioners and Heat Pumps using Puron® Refrigerant to
obtain required unit changes for specific applications and for R-22
retrofit.

Step 1—Check Equipment and Job Site

UNPACK UNIT

Move to final location. Remove carton taking care not to damage
unit.

INSPECT EQUIPMENT

File claim with shipping company prior to installation if shipment
is damaged or incomplete. Locate unit rating plate on unit corner
panel. It contains information needed to properly install unit.
Check rating plate to be sure unit matches job specifications.

Step 2—Install On a Solid, Level Mounting Pad

If conditions or local codes require the unit be attached to pad, tie
down bolts should be used and fastened through knockouts
provided in unit base pan. Refer to unit mounting pattern in Fig. 3
to determine base pan size and knockout hole location.

On rooftop applications, mount on level platform or frame. Place
unit above a load-bearing wall and isolate unit and tubing set from
structure. Arrange supporting members to adequately support unit
and minimize transmission of vibration to building. Consult local
codes governing rooftop applications.

Do not allow POE lubricant to come into contact with roofing
material. POE may determine certain types of synthetic
roofing.

Roof mounted units exposed to winds above 5 mph may require
wind baffles. Consult the Application Guideline and Service
Manual for Residential Split-System Air Conditioners and Heat
Pumps using Puron® Refrigerant for wind baffle construction.

NOTE:

Unit must be level to within ± 2° (± 3/8 in./ft) per

compressor manufacturer specifications.

Step 3—Clearance Requirements

When installing, allow sufficient space for airflow clearance,
wiring, refrigerant piping, and service. Allow 30-in. clearance to
service end of unit and 48 in. above unit. For proper airflow, a 6-in.
clearance on 1 side of unit and 12 in. on all remaining sides must
be maintained. Maintain a distance of 24 in. between units.
Position so water, snow, or ice from roof or eaves cannot fall
directly on unit.

On rooftop applications, locate unit at least 6 in. above roof
surface.

Step 4—Operating Ambients

The minimum outdoor operating ambient in cooling mode without
additional accessories is 55°F, and the maximum outdoor operat-
ing ambient in cooling mode is 125°F. The maximum outdoor
operating ambient in heating mode is 66°F.

Fig. 2—Connecting Tubing Installation

A94028

INSULATION

VAPOR TUBE

LIQUID TUBE

OUTDOOR WALL

INDOOR WALL

LIQUID TUBE

VAPOR TUBE

INSULATION

CAULK

Avoid contact between tubing and structure

NOTE:

THROUGH THE WALL

HANGER STRAP

(AROUND VAPOR

TUBE ONLY)

JOIST

1

MIN.

SUSPENSION

Fig. 3—Mounting Unit to Pad

DIMENSIONS (IN.)

UNIT

SIZE

MINIMUM

MOUNTING PAD

DIMENSIONS

TIEDOWN KNOCKOUT

LOCATIONS

A

B

C

018, 024, 030

22-1/2 X 22-1/2

3-11/16

18-1/8

14-3/8

036–060

30 X 30

6-1/2

23-1/2

20

A94199

C

B

A

3

8

D. (9.53) TIEDOWN

KNOCKOUTS (2) PLACES

2