Factory setting parameters – TriangleTube 110 Solo User Manual
Page 61

55
Factory Setting Parameters
Factory Setting Parameters
1
140ºF
DHW Setting
2
01
DHW Application Selection
3
01
CH Application Selection
4
186ºF
CH Maximum Boiler Operating Setpoint
10
86ºF
CH Minimum Boiler Operating Setpoint
11
00ºF
CH Reset Curve Coldest Day
12
64ºF
CH Reset Curve Warmest Day
13
-22ºF
Frost Protection Setpoint
18
32ºF
CH Block Temperature Setting
19
00 Minutes
Boost Feature Setting
20
00ºF
Parallel Shift Value
21
46ºF
Setpoint Value Addition for DHW
32
01 Minutes
CH Circulator Post Pump Time Period
33
03 x 10.2 Sec.
DHW Circulator Post Pump Time Period
38
02ºF
DHW On Differential
39
06ºF
DHW Off Differential
40
03 x 10.2 Sec.
CH Call Blocking Time
41
00 x 10.2 Sec.
DHW Call Blocking Time
42
00 x 10.2 Sec.
DHW to CH Call Blocking Time
43
00 Minutes
DHW Priority Timeout
45
00
CH Operating Signal Selection
46
02
DHW Operating Signal Selection