beautypg.com

Fieldpilot, Recommended electronics installation – TeeJet FieldPilot Install ACGO Gleaner R62-65-72-75 User Manual

Page 18

background image

www.teejet.com

16

FieldPilot

®

12. recOMMended electrOnics installatiOn

The SCM should be mounted as far forward in the cab as possible. The control console can be mounted to

the operator’s preference. The GPS antenna should be mounted as far forward as possible on top of the

cab on a metal surface of at least 4” square.
Figure 1-14: Recommended Electronics Installation

sCM

Gps

13. VeriFy OPeratiOn OF hydraulics and set the steering

cOntrOl rate

Clean and pick up the area around the vehicle and make certain that it is safe to operate. Start the engine

and check hydraulic connections for leaks. Rotate the steering wheel from one extreme to the other and

back to center, check for leaks. While steering through the extremes of movement, check the cables and

hoses for wear points and strain, adjust as necessary.
PLEASE NOTE THE FOLLOWING RECOMMENDATION FROM AGCO:
After servicing of the steering cylinders and/or hydraulic hoses, any air that may be trapped in the hydraulic

system must be bled in order to provide smooth, instantaneous operation of the steering system. To bleed

the steering cylinders and/or hydraulic hoses, proceed as follows:

Jack up the rear axle (on both sides) until the rear wheels are off the ground. Securely block the rear

axle. Start the engine and turn the steering wheel as if making a right hand turn (as far as it will go) until

the left hand steering cylinder is completely retracted and the right hand steering cylinder is completely

extended. Turn the steering wheel as if making a left hand turn (as far as it will go) until the left hand

steering cylinder is completely extended and the right hand steering cylinder is completely retracted.

Repeat these steps until the steering cylinders operate smoothly and instantaneously in both directions.