beautypg.com

Em-40-sm service manual applications – Slant/Fin EM-10 Service Manual User Manual

Page 27

background image

27

EM-40-SM Service Manual

Applications

Mode 6 and 7 – External Target Temperature Input and Setpoint Operation

Mode 6 – External Target Temperature Input and
Setpoint with Parallel Piping

The control receives a heat demand provided from an
external target temperature input signal. The control turns
on the boiler pump and operates the boiler to maintain the
target temperature at the boiler outlet sensor. The control
receives a setpoint demand from a DHW aquastat. The
control turns on the boiler pump and operates the boiler to
maintain the setpoint boiler target temperature at the boiler
outlet sensor whenever a setpoint demand is present.

Note:

An external relay is required to operate the DHW

pump and provide DHW priority if required by disabling
the boiler pump.

Mode 7 – External Target Temperature Input and
Setpoint with Primary – Secondary Piping

The control receives a heat demand provided from an
external target temperature input signal. The control turns
on the boiler pump and operates the boiler to maintain the
target temperature at the boiler supply sensor. The control
receives a setpoint demand from an external control. The
control turns on the boiler pump and operates the boiler to
maintain the setpoint boiler target temperature at the boiler
supply sensor whenever a setpoint demand is present.

BTC

Mode 6

EMS

0-10 V (dc)

Relay

Boiler Inlet Sensor (Included)

Factory

Installed

Boiler

Outlet

Sensor

BTC

Mode 7

0-10 V (dc)

tN4 System

Control

Relay

Boiler Inlet Sensor (Optional)

Factory

Installed

Boiler

Outlet

Sensor

Secondary

Piping

Sensor

(Included)

External

Control

Sensor