Operation (continued) – Shellab BACTRONEZ User Manual
Page 26

26 |
P a g e
OPERATION (CONTINUED)
7. Perform the following procedures to setup the BACTRONEZ workstation for use.
page 27
Dual Gas Connection procedure
page 28
Connecting to an In-House Vacuum System
page 29
page 29
page 29
Connecting the Foot Pedal Assembly
page 30
page 31
Establishing an Anaerobic Atmosphere
page 32
Installing the Sleeve Assemblies
page 34
page 35
Verifying Anaerobic Atmosphere
page 35
page 37
Setting the Incubator Temperature
page 39
Setting the Over Temperature Limit
page 39
See also other documents in the category Shellab Equipment:
- BACTRON300 (70 pages)
- BACTROX (32 pages)
- SCO2W (25 pages)
- SCO26H (21 pages)
- SCO6AD (47 pages)
- SCO5A (21 pages)
- SCO6WE (26 pages)
- SCO58 (40 pages)
- SCO5W (27 pages)
- SRI6PF (30 pages)
- SRI3P (27 pages)
- SHC10 (27 pages)
- SHO1 (18 pages)
- 74300-706 (20 pages)
- SMI31 (20 pages)
- SMI4E (14 pages)
- SMI2 (19 pages)
- SMI1EM (14 pages)
- SMI1E (17 pages)
- SMO5HP-2 (28 pages)
- SMO3 (17 pages)
- SMO1E (21 pages)
- SMO14HP-2 (19 pages)
- SGO1E (21 pages)
- SGO3 (17 pages)
- SMO10HP-2 (20 pages)
- SGO5 (16 pages)
- SMO14-2 (26 pages)
- SMO5CR-2 (31 pages)
- SRI3 (14 pages)
- SRI21F (18 pages)
- SRI21D (22 pages)
- SRI20 (15 pages)
- SSI5R-HS (22 pages)
- SSI2 (20 pages)
- SSI5 (26 pages)
- SSI3 (15 pages)
- SSI10 (28 pages)
- SWBR17 (24 pages)
- SVAC1 (31 pages)
- SVAC1E (18 pages)
- SWBC22 (18 pages)
- SWB2 (29 pages)
- SWB30 (18 pages)