SeaLand 8900 Series MasterFlush Installation User Manual
Page 11
11
5.4
Toilet system with through-the-wall
connections
5.5
Toilet/bidet combination
1 . To route wiring and plumbing connections
through the wall, use floor template to locate the
vertical centerline of each hole .
2 . Place toilet in proper position and mark
horizontal centerlines (fig .
20
) .
3 . Drill holes sizes as indicated on template .
4 . Route wiring and plumbing through holes
according to system requirements (Section
4.2) . Make sure to provide extra discharge hose
length to assure easy connection to toilet .
5 . Follow toilet installation instructions beginning
at Section 5.3, step 12 .
1 . In Section 5 .3, step 3, cut out oblong access hole as
marked on floor template to accommodate two water line
connections and wiring .
2 . Route cold water supply line to toilet/bidet mixer valve water
line (with blue band) (fig .
21
) .
3 . Route hot water supply line to bidet faucet hot water line
(with red band) .
4 . Route wiring and discharge plumbing through holes
according to system requirements (Section 4.2) . Make
sure to provide extra discharge hose length to assure easy
connection to toilet .
5 . Follow toilet installation instructions beginning at Section
5. 3, step 12 .
20
21
SeaLand MasterFlush Toilet
Installation