Installation instruction – Reznor P6SP Option - Installation - Power Exhaust - Light Commercial User Manual
Page 3

HORIZONTAL APPLICATION
7.
Secure power exhaust to side face of
the horizontal duct over the precut
hole with screws provided. Support
assembly as required. Caulk all
seams to ensure a leak free seal.
8.
Install barometric relief hood in front of
exhaust air opening.
9.
Reconnect power to the unit. Energize
economizer to an opening greater
t h a n w h a t t h e p o w e r e x h a u s t
activation switch is set for to verify
proper accessory operation.
BAROMETRIC RELIEF HOOD
EXHAUST AIR OPENING
RETURN DUCT
SUPPLY DUCT
NEIPE07
SUPERSEDES 09-02-08
JULY 14, 2009
CUT OPENING
INSTALLATION
INSTRUCTION
INSTALLATION INSTRUCTIONS FOR
POWER EXHAUST USED WITH Q5SN AND
R4G(M,N)-090/120 (R-22) UNITS AND P6SP, R6SP,
Q6SP-072/120 (R410A) UNITS
Return Duct Size:
6 and 7.5 Ton Models - 31 ½" W x 12
3
8
" H
10 Ton Models - 31 ½" W x 19" H
Horizontal duct at unit requires 1" top and
bottom flanges and 2 ½" side flanges for proper
mounting and sealing to economizer and unit.
Power Exhaust Air Opening:
6 and 7.5 Ton Models - 30" W x 11 ½" H
10 Ton Model - 30" W x 18" H
Figure 4