INSTALLATION/PERFORMANCE CHECK LIST

REFRIGERATION SYSTEM:

Was unit given 24 hr warm up period
for crankcase heaters?

YES

NO

Stage-1 Liquid Pressure (high side) ________________________

Stage-1 Suction Pressure (low side) ________________________

Has the owner’s information been
reviewed with the customer?

YES

NO

Has the Literature Package been left
with the unit?

YES

NO

INSTALLATION ADDRESS:

CITY ________________________

STATE ________________

UNIT MODEL # ________________________________________

UNIT SERIAL # _______________________________________

Unit Installed Minimum clearances per
Figure 2 (page 7)?

YES

NO

INSTALLER NAME:

CITY _______________________

STATE ________________

ELECTRICAL SYSTEM:

Electrical connections tight?

YES

NO

Line voltage polarity correct?

YES

NO

Rated Voltage: ___________________________________ VOLTS

L1-L2 Volts: _____________________________________ VOLTS

L1-L3 Volts: _____________________________________ VOLTS

L2-L3 Volts: _____________________________________ VOLTS

Avg. Volts: ______________________________________ VOLTS

Max. deviation of voltage
from avg. volts: ___________________________________ VOLTS

% Volt imbalance: ________________________________ VOLTS

Blower Motor HP: ________ Sheave Setting ___________# Turns

Has the thermostat been calibrated?

YES

NO

Is the thermostat level?

YES

NO

Is the heat anticipator setting correct?
(If Applicable)

YES

NO