V. adjustments and minor maintenance, Adjustments and minor maintenance, Initial setup hotcup operators’ guide – CMS Products 674 User Manual
Page 36

Initial Setup
HotCup Operators’ Guide
6740001
30
November, 2007
V.
ADJUSTMENTS AND MINOR MAINTENANCE
1.
Empty the Bill Stacker
2.
Adjust the Water Valves
Water valves do not usually require adjustment, but in some cases adequate water volume cannot
be achieved by the throw time setting alone (See “Programming The HotCup” on page 34). If
absolutely necessary, adjust the valves in conjunction with setting the factory default timers during
the Product Configuration programming mode.
a. Using a slotted screwdriver, turn the adjustment screw clockwise to decrease the water flow
rate.
b. Turn the adjustment screw counterclockwise to increase the water flow rate.
WATER VALVE
ADJUSTMENT
SCREW
WATER
VALVE
+
-
1
2
3
4
5
6
WATER
6
WATER
TANK
This manual is related to the following products: