Cisco CRS-1 User Manual
Page 58
A-2
Cisco CRS Carrier Routing System 8-Slot Line Card Chassis Site Planning Guide
OL-5802-09
Appendix A Preliminary Site Survey
Site Survey Contacts
Primary Contact
Name:
Title:
Phone number:
Mobile phone number:
Fax number:
Pager number:
E-mail address:
Secondary Contact
Name:
Title:
Phone number:
Mobile phone number:
Fax number:
Pager number:
E-mail address:
Delivery and Installation Constraints
Is there a loading dock available to unload
the equipment at this site?
Is the path to the installation area
unobstructed? If not, can special
arrangements be made to get the
equipment to the installation area?
Describe them.
On what floor is the installation?
If it is on a floor other than the ground
floor, is there a freight elevator available?
Note if the equipment will have to be
brought up a flight of stairs.
Is there someone on site during working
hours to accept delivery of the materials?
If not, list the times this person would be
available.
Table A-1
Sample Preliminary Site Survey (continued)
Preliminary Site Survey