beautypg.com

Cisco CRS-1 User Manual

Page 58

background image

A-2

Cisco CRS Carrier Routing System 8-Slot Line Card Chassis Site Planning Guide

OL-5802-09

Appendix A Preliminary Site Survey

Site Survey Contacts

Primary Contact

Name:

Title:

Phone number:

Mobile phone number:

Fax number:

Pager number:

E-mail address:

Secondary Contact

Name:

Title:

Phone number:

Mobile phone number:

Fax number:

Pager number:

E-mail address:

Delivery and Installation Constraints

Is there a loading dock available to unload
the equipment at this site?

Is the path to the installation area
unobstructed? If not, can special
arrangements be made to get the
equipment to the installation area?
Describe them.

On what floor is the installation?

If it is on a floor other than the ground
floor, is there a freight elevator available?
Note if the equipment will have to be
brought up a flight of stairs.

Is there someone on site during working
hours to accept delivery of the materials?
If not, list the times this person would be
available.

Table A-1

Sample Preliminary Site Survey (continued)

Preliminary Site Survey