Oberon 1078-CCOAP User Manual
Installation instructions, Model number 1078-ccoap
Installation Instructions
Model Number 1078-CCOAP
(877) 867-2312 • www.oberonwireless.com
Rev. B1 0/23/13
Oberon, Inc. •••• 1315 South Allen Street •••• State College, PA 16801
Copyright 2013
Figure 3 - Cable Clamp Installation
Figure 2 - Cutout Dimensions
Wall Bridge In Mounting Position
Figure 1 - Installation Into Wall/Ceiling
This product is Listed by Underwriters
Laboratories Inc. Representative
samples of this product have been
evaluated by UL and meet applicable
safety standards.
File #E348543
Figure 4 - Locked Position
Model 1078-CCOAP Locking Recess Wall/Ceiling Mount Assembly Components:
- Ceiling enclosure Model 1078-CCOAP assembly – 1 each
- Wall bridge – 2 each
- #8-32 X 3/8 “ screw – 4 each
- #8-32 nut – 4 each
- 3/4” Trade size conduit connector – 1 each
- Fire block foam – 1 each
- Keys for access door lock – 2 each
- Installation instructions – 1 each
- Eyebolt – 4 each
- Support wire – 4 each
If any of these items are missing, contact your Oberon representative.
Find a flat work surface to assemble the enclosure, access
point and antenna(s) (if needed) prior to mounting in wall or
ceiling.
Step 1 - Cut a 13” horizontal x 13.4” vertical opening in the
"hard lid" ceiling or wall (special
cutting
tools may be required –
ref. Figure 1).
Step 2 – Place the enclosure assembly on the work surface.
Remove one of the 1” trade size hole cover on the side of
the enclosure and install the 1” trade size conduit connector
(the side on which the trade size cable clamp is to be
installed will be determined by the location the enclosure is
to be installed and direction from which conduit will be
brought into the enclosure – ref. Figure 2).
Step 3 – Place the (2) two wall bridges in the mounting
position by loosing the (4) four wing nuts inside of the
enclosure. The position of the wall bridges will look like the
image in Figure 3. Place the enclosure in to the hole that
was cut in Figure 1. Angle the enclosure at 10° with the wall
bridges extended towards the bottom. The wall bridges will go in first. Once the bottom of the enclosure is in the hole push the
enclosure so it is flush with the wall or ceiling.
Page 2
Step 4 – Once the enclosure is flush with the wall or ceiling, slide the wall bridges in the L-slot, and draw the bridges against
the wall. Tighten the wing nuts one side at a time (Figure 4). At this point, the enclosure is ready to be "mudded" into the wall.
Additional material my be needed.
**IMPORTANT** - This is an important safety feature that could prevent human injury or damage to the access
point should the unit become dislodged from the wall or ceiling. Page 3