beautypg.com

8 main lift sensor installation on haz/hpz – NORAC UC5-BC-HD06 User Manual

Page 20

background image



17

6.8 Main Lift Sensor Installation on HAZ/HPZ

The general mounting rule for UC5 ultrasonic sensors must be followed for the
main lift sensor.

1. Mount the ML bracket (Item B11) as illustrated in Figure 13. Ensure sensor cable is routed

properly and securely fastened.

2. Mount the Ultrasonic sensor to the bracket. Ensure the sensor has a clear view of the

ground. Ensure sensor cable is securely fastened with cable-ties.









Figure 13: Main Lift Sensor Mounted to the HPZ/HAZ Center Part