11. Route the DT connectors on C16 to
the sprayer valve block.
12. Disconnect the Left Up DT connector
from the valve block and plug it into the
connector marked “Left Up” on cable
C16.
13. Connect the DT plug labeled “Left Up”
on cable C16 into the Left Up
connector on the GVM valve block.
14. Disconnect the Left Down DT
connector from the valve block and plug
it into the connector marked “Left
Down” on cable C16.
15. Connect the DT plug labeled “Left
Down” on cable C16 into the Left
Down connector on the GVM valve
block.
16. Disconnect the Right Up DT connector
from the GVM valve block and plug it
into the receptacle marked “Right Up”
on cable C16.
17. Connect the DT plug labeled “Right Up”
on cable C16 into the Right Up
connector on the GVM valve block.
18. Disconnect the Right Down DT
connector from the GVM valve block
and plug it into the receptacle marked
“Right Down” on cable C16.
19. Connect the DT plug labeled “Right
Down” on cable C16 into the Right
Down connector on the GVM valve
block.
20. Connect the Main Lift interface cable
(C12) to the 6 pin tower on cable C11.
21. Route the DT connectors on cable C12
to the GVM valve block.
22. Remove the connector from the Main
Up solenoid and connect the DT plug
labeled “Main Up” on cable C12 to the
valve.
23. Connect the plug that was disconnected
from the solenoid to the receptacle
labeled “Main Up” on cable C12.
24. Remove the connector from the Main
Down solenoid and connect the DT
plug labeled “Main Down” on cable C12
to the valve.
25. Connect the plug that was disconnected
from the solenoid to the receptacle
labeled “Main Down” on cable C12.
26. The connectors labeled “Right Up”,
“Right Down”, “Left Up” and “Left
Down” on cable C12 are not used for
this installation.
27. Connect the CAN Node cable (C02B)
to the 4-pin AMP plug on C11.
28. Route the CAN Node cable (C02B) to
the roll sensors. Follow existing cables
and/or hydraulic lines.
29. Connect the sensor branch cable (C02)
to the 4-pin AMP plug on C02B.
30. Route the sensor branch cable (C02) to
the wing and main sensors. Follow
existing cables and/or hydraulic lines
along the boom.
31. Cable-tie the installed cables every 12
inches.
IMPORTANT:
Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.