beautypg.com

NORAC UC4+BC+CS5 User Manual

Page 30

background image

28

21. Connect the Roll Bias Cable (C05) to

the AMP connector on C11 (see
Figure 33).

22. Route the long cable on C05 to the

chassis roll sensor and connect it to the
roll sensor.

23. Connect the CAN Node cable (C02B)

to the short stub on cable (C05).

24. Route the CAN Node cable (C02B) to

the roll sensors which are installed in
Section 4.5. Follow existing cables
and/or hydraulic lines.

25. Connect the 4-pin AMP connectors to

the roll sensors.

26. Connect the sensor branch cable (C02)

to the 4-pin AMP plug on C02B
(Figure 33).

27. Route the sensor branch cable (C02) to

the wing and main sensors and connect
to the sensors. Follow existing cables
and/or hydraulic lines along the boom.

28. Cable-tie the installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to
account for the movement of the

main section, parallel lift, and
FOLDING boom movement.

Figure 33: Cable Configurations: C11,

C02 and C02B