beautypg.com

NORAC UC4+BC+CS5 User Manual

Page 29

background image

27

Figure 31: Cable Configurations: Rear of the Sprayer

13. Insert the 2-pin plugs (P01) into

connectors R2D, R2E, R2F and R2G on
cable C12.

14. Connect the 2-pin tees (which are

labeled as “MAIN UP” and “MAIN
DOWN” on the branch wires) of C12
to the matching tees of the main
extension interface cable (C18). There
is an extra “MAIN UP” tee on C12.
This extra tee is not used for this
installation and should be plugged
together.

15. Route the free end of C18 to the

existing main control valve block.

16. Insert the 2-pin tees of C18 between

the matching main control valve
connections.

17. Connect the 6-pin Tower on the valve

cable (C03) onto the mating connector
on C11.

18. In Figure 32 the connectors on cable

C03 are marked RIGHT UP, LEFT
UP
, RIGHT DOWN and LEFT
DOWN
. Cables labeled with UP go
on the same side as the hydraulic hoses.

Figure 32: Valve Cable Connections

19. Connect the 3-pin tower on cable C19

to the 3-pin shroud on C17.

20. Route the free end of cable C19 to the

3

rd

station of the NORAC block and

connect the 2-pin DT connectors to the
3

rd

station block coils. The connector

labeled Roll CW controls the Main
Up
function and should be connected
on the same side of the block as the
hoses. The connector labeled as Roll
CCW
controls the Main Down
function.