NORAC UC4+BC+CS5 User Manual
Page 29
27
Figure 31: Cable Configurations: Rear of the Sprayer
13. Insert the 2-pin plugs (P01) into
connectors R2D, R2E, R2F and R2G on
cable C12.
14. Connect the 2-pin tees (which are
labeled as “MAIN UP” and “MAIN
DOWN” on the branch wires) of C12
to the matching tees of the main
extension interface cable (C18). There
is an extra “MAIN UP” tee on C12.
This extra tee is not used for this
installation and should be plugged
together.
15. Route the free end of C18 to the
existing main control valve block.
16. Insert the 2-pin tees of C18 between
the matching main control valve
connections.
17. Connect the 6-pin Tower on the valve
cable (C03) onto the mating connector
on C11.
18. In Figure 32 the connectors on cable
C03 are marked RIGHT UP, LEFT
UP, RIGHT DOWN and LEFT
DOWN. Cables labeled with UP go
on the same side as the hydraulic hoses.
Figure 32: Valve Cable Connections
19. Connect the 3-pin tower on cable C19
to the 3-pin shroud on C17.
20. Route the free end of cable C19 to the
3
rd
station of the NORAC block and
connect the 2-pin DT connectors to the
3
rd
station block coils. The connector
labeled Roll CW controls the Main
Up function and should be connected
on the same side of the block as the
hoses. The connector labeled as Roll
CCW controls the Main Down
function.