4 connecting a display unit, 7 operation – KERN & SOHN BBN 3T-3M User Manual
Page 9

6.4 Connecting a display unit
Attention
Put the connecting cable to the display unit in a manner that it is protected against
damage.
Description of the connection cable:
terminal
Color
State
EXC+ [IN+]
red
voltage +
SIG + [OUT+]
green
signal +
SIG -[OUT-]
white
signal -
EXC -[IN- ]
black
voltage -
7 Operation
Information about
• Network connection (power is supplied via the connecting cable of the
display unit)
• Initial Commissioning
• Connection of peripheral devices
• Adjustment, linearization and verification (only the complete balance is
verifiable, i.e. weighing bridge in conjunction with a suitable display unit)
and the correct operation you will in the operating instructions included in the scope
of delivery of the display unit.
So a continuous optimal performance is guaranteed:
• Avoid falling load, shock loads and impacts from the side!
• For weighing operation, all objects must be placed
centrically of the weighing bridge and may not hang over
the edges or the ramps.
• Check adjustment at regular intervals.
9
KFP V40-IA-e-1412