2 unpacking, scope of delivery – KERN & SOHN BBN 3T-3M User Manual
Page 7

6.2 Unpacking, Scope of delivery
CAUTION
+
Danger for the back!
The weighing bridge is relatively heavy. Always use a suitable
lifting device to lift it out of the packaging or to transport it to
the required installation site.
+
Do not step under the suspended load, risk of injury!
Scope of delivery:
• Weighing bridge with assembled connection cable
• 4 weighing cell feet
• Operating instructions
Ensure that the contents of package is complete.
According to the version, for assembling the weighing bridge the following accessories
(optional) must be available:
(A) 2 access ramps
or
(B ) 1 access ramp and 1 foot plate set
or
(C ) 2 foot plate sets
7
KFP V40-IA-e-1412
This manual is related to the following products: