0 tamper annunciation relay board mounting, 0 wire routing, 0 contact keri systems – Keri Systems KE-8 User Manual
Page 5: Ke-8 controller enclosure, Installation guide
KE-8 Controller Enclosure
Installation Guide
Page 5 of 5
P/N: 01515-001 Rev. C
4.0
Tamper Annunciation Relay Board Mounting
A Tamper Annunciation Relay Board is required to meet UL-294 requirements. Please refer to the Tamper Annunciation
installation document for wiring instructions.
Figure 4 - Tamper Relay Board Mounting
5.0
Wire Routing
Eighteen knockouts are included for your convenience around the perimeter of the enclosure. Use good wiring
practices when wiring Controllers and the Tamper Relay board. Ensure all wiring is done to national and local
electrical codes (NEC).
6.0
Contact Keri Systems
End of document.
Keri USA
Keri UK, Ireland, Europe
2305 Bering Drive
San Jose, CA 95131
Unit 17
Park Farm Industrial Estate
Ermine Street
Buntingford
Herts SG9 9AZ UK
Telephone: (800) 260-5265
(408) 435-8400
Telephone: + 44 (0) 1763 273 243
Fax: (408) 435-7163
Fax:+ 44 (0) 1763 274 106
Web: www.kerisys.com
Web:www.kerisystems.co.uk
E-mail: [email protected]
E-mail:[email protected]
[email protected]
Enclosure Body - TOP EDGE
Tamper Annunciation Board
Mounting Location