Golden Lighting 7509-BA2 PW User Manual
Parts & assembly sheet, Parts list
![background image](/manuals/678043/1/background.png)
Mounting Strap
Junction Box
Screw
Mounting Screw
1ea 4"X3"
2ea 8/32"X1"
2ea 8/32"X28mm
Wire
Connnector
Hex Nut
Deco Nut
(round nut)
3ea P3 Orange
2ea 8/32"X3.5mm
2ea 9X9.5mm
Green Ground
Screw
Bulb
1ea 8/32"X10mm
2ea G9*40W
Part Needed
Quantity
Part Needed
Quantity
Reason why
( missing, scratched, broken glass, bent, bad finish)
Comments
NOTE: I
NSTALL THE GLASS ASSEMBLY
AFTER THE FIXTURE IS HUNG.
For Customer Service, contact the place of purchase to arrange for replacement parts.
Fig. 1
below to be filled out by retailer
F
IXTURE
A
SSEMBLY
I
NSTRUCTIONS
Read and review installation instruction sheet
before assembling the fixture.
7509-BA2 PW
PARTS LIST
1.Pour Crystals (Y) into the groove of Glass Shade (O). Then,
gently slide Glass Shade (O) over the socket and secure Glass
Shade (O) by threading Socket Ring (L) over the socket.
2. Thread the Final Cap (R) into Bath Bar (S) unitl tighted.
3. Install the provided light bulb in accordance with the fixture's
specifications. Bulb note: Use a tissue or paper towel to hold
the bulb and push down into the socket. Oils or dirt can cause
the bulb life to shorten. Rubbing alcohol is recommended to
clean the bulbs if dirty.
(DO NOT EXCEED THE MAXIMUM WATTAGE RATING!)
PARTS & ASSEMBLY SHEET
Fixture Name: Asteria 7509-BA2 PW
This fixture assembled PO:__________ Date: ________
Notice:
Please review the parts listing and check for all parts before assembling the fixture. If any parts are
missing or damaged, please note onthis sheet and contact the place of purchase to arrange for replacement
parts.
Company Name:_______________________Co. Account #:___________