8201-sf(b)blk-slv, Installation instruction, Warning! shut off power at fuse or circuit breaker – Golden Lighting 8201-SF SLV User Manual
Page 3

WARNING! SHUT OFF POWER AT FUSE OR CIRCUIT BREAKER.
HANGING THE FIXTURE as Semi flush (Fig. 1)
1. Carefully remove the new fixture from the carton and the
yellow bag that holds all your parts. Check that all parts are
included as shown in the illustration and Parts List.
2. Shut off power at the circuit breaker and completely remove
the old fixture from ceiling, including the old mounting strap.
3.Circular Strap (B) contains several pairs of threaded holes.
Find the pair of holes that matches the spacing of the holes in
Canopy (F) and thread Mounting Screws (A) half way into the
Mounting Strap (B) facing down. Secure in place with hex nuts.
The threaded ends should protrude through the holes in
Canopy (F).
4. Place Mounting Strap (B) over the junction box.
5. Attach the Mounting Strap (B) to the Junction Box using
Mounting Screws (C). Tighten the screws securely with a screw
driver.
Fig. 1
CONNECTING THE WIRES (Fig. 2)
6. Attach the power supply wires to the fixture lead wires by
connecting BLACK to BLACK (or SMOOTH) and WHITE to WHITE (
or RIBBED) .
7. Ground wire connection: Connect the fixture ground wire to
house ground wire, which usually has green or copper
insulation, with the correct size of wire connector. If there is no
house ground wire at ceiling junction box then attach fixture
ground wire securely onto green grounding screw located on
the mounting bar.
NOTE: Twist the wires together in the same direction that you
twisted the wire connector onto the wires.
8. Tuck the wire connections neatly into the Junction Box.
Fig. 2
INSTALLATION INSTRUCTION
Fixture Name: Tetiva 8201-SF BLK/SLV
For Semi Flush / Convertible Light Fixtu
BARE COPPER
(Ground)
GR
(G
FIXTURE WIRES
SMOOTH (BLACK)
RIBBED (WHITE)
BLACK
WHITE
HOUSE WI